Morocco

Vacancy Details

Grade: 11

No questions specified.

Grade: All Grades

1 Are you able to legally work in this country? Answer to this question is required
  • Yes
    1.1 If yes, tell us more about yourself and if applicable, select the type of permit you currently possess (upload the appropriate paperwork in the Documents section)
    • I am a citizen of this country.
    • I have a work permit.
    • I have a study permit.
    • I have a U.S. diplomatic visa.
    • I am the holder of a non-diplomatic visa
    • I am the holder of a work and/or residency permit of the host country.
    • None of the above.
  • No
2 Are you a current employee of this mission/consulate?   Answer to this question is required
  • Yes
  • No
3 Do you have the required education as stated in the Vacancy Announcement? Answer to this question is required
  • Yes
  • No
4 What is the highest level of education you have completed? Answer to this question is required
  • Primary School
  • Secondary School
  • College (2 years)
  • University Degree
  • Masters or Equivalent
  • Doctorate
5 Do you have the required experience as stated in the Vacancy Announcement? Answer to this question is required
  • Yes
  • No
6 Do you have the required language level (s) for  the listed language (s) in this vacancy announcement? Answer to this question is required
  • Yes
  • No
7 Do you have a current and valid driver's license if this job requires driving? Answer to this question is required
  • Yes
  • No
8 Have you identified errors, inconsistencies, and/or omissions on construction drawings (e.g., entrance door too narrow) and recommended alternate options? Answer to this question is required
  • Yes
  • No
9 Select the types of structures for which you have developed construction or renovation designs/drawings. Answer to this question is required
  • Commercial buildings
  • Residential buildings
  • Historical buildings
  • Utility/power facilities
  • Parking structures
  • None of the above
10 Select the disciplines for which you have created computer-aided designs (CAD). Answer to this question is required
  • Civil
  • Mechanical
  • Electrical
  • Construction
  • Environmental
  • Architectural
  • None of the above
11 Which statement best describes your highest level of experience creating engineering drawings using computer-aided design (CAD) software (e.g., AutoCAD)? Answer to this question is required
  • I completed training or education on how to use CAD software, but I have not yet applied it on the job.
  • I replicated paper-based designs in CAD software following instructions.
  • I created basic designs in CAD software from scratch (e.g., one discipline, layout for a single room).
  • I created advanced designs in CAD software (e.g., multiple disciplines, 3D design).
  • None of the above.
12 What is the largest construction project that you have monitored/overseen (i.e., US dollar value)? Answer to this question is required
  • Less than 250,000
  • 250,001-500,000
  • 500,001-1,000,000
  • 1,000,001-5,000,000
  • 5,000,001-10,000,000
  • More than 10,000,000
  • None of the above
13 Choose the statement that best reflects your highest level of experience monitoring the work of contracting staff on building construction projects. Answer to this question is required
  • I monitored contractors' work to provide status updates to my manager.
  • I inspected/reviewed contractors’ work and recommended approval/rejection.
  • I have been responsible for approving/rejecting contractors' work based on quality and compliance with standards.
  • None of the above.
14 Select the statement that best describes your highest level of experience overseeing construction projects. Answer to this question is required
  • I recommended improvements to overall work processes, controls, or operations for multiple, simultaneous construction projects.
  • I recommended improvements to work processes, controls, or operations for a specific construction project.
  • I monitored activity for a single construction project to ensure compliance with contract specifications.
  • None of the above.
15 Have you independently interpreted building and construction codes while reviewing engineering drawings/projects? Answer to this question is required
  • Yes
  • No
16 Choose the statement that best describes your highest level of experience interpreting and applying safety standards/practices related to building construction. Answer to this question is required
  • I trained others to interpret and apply safety standards/practices on building construction projects.
  • I have interpreted and applied construction safety standards/practices to my own actions.
  • I have completed training on safety standards/practices, but have not yet applied them on the job.
  • None of the above.
17 Which contract activities have you performed in support of a construction/engineering project? Answer to this question is required
  • Communicated program requirements
  • Wrote an acceptance/project plan
  • Determined whether contractor performance was acceptable or unacceptable
  • Maintained files/records of contracting deliverables, specifications, and/or changes
  • Approved/made payments
  • Informed the Contracting Officer (CO) of any issues with the contractor’s performance
  • Provided technical direction to the contractor
  • None of the above
18 Which types of materials have you analyzed to make an informed decision on a building construction project? Answer to this question is required
  • Material samples
  • Engineering drawings
  • Installation manuals
  • Performance reports
  • Project plans
  • None of the above
19 Which statement best describes your highest level of experience writing technical reports that synthesize engineering project results/performance (e.g., building construction, electrical equipment/systems)? Answer to this question is required
  • I have not had education, training, or experience writing technical reports that synthesize engineering project results/performance.
  • I have written technical reports that synthesize engineering project results/performance as part of my academic coursework.
  • I have assisted a supervisor or senior employee in writing technical reports that synthesize engineering project results/performance.
  • I have independently written technical reports that synthesize engineering project results/performance.
  • I have trained others on writing technical reports that synthesize engineering project results/performance.
20 Which items have you estimated while developing a budget for engineering operations? Answer to this question is required
  • Equipment maintenance cost
  • Equipment repair costs
  • Equipment Installation cost
  • Spare parts needed
  • Tools to diagnose the equipment
  • None of the above
21 Which types of documents have you translated? Answer to this question is required
  • Procedures or guidelines
  • Investigation reports
  • Training manuals
  • Conversation transcripts
  • Business letters or memos
  • Briefing papers
  • None of the above
22 Which tasks have you performed related to contractor projects? Answer to this question is required
  • Prepared Statements of Work (SOW) and other documents
  • Monitored contractor progress/quality
  • Developed punch lists and conducted work inspections
  • None of the above
23 Which activities have you performed to manage a construction project? Answer to this question is required
  • Reviewed architectural drawings for acuracy.
  • Inspected construction activities (i.e., materials, methods, or equipment).
  • Reviewed completed construction work for approval/rejection.
  • Resolved problems that arose during construction (e.g., deficiency in materials).
  • Maintained records of contruction project activities (e.g., goals, accomplishments, payments).
  • Determined compliance with the construction contract requirements.
  • None of the above.
24 Select the response that best describes your highest level of experience conducting constructability reviews. Answer to this question is required
  • I do not have education, training, or experience conducting constructability reviews.
  • I have completed coursework on constructability reviews, but have not performed this task on the job.
  • I have compared construction design to site conditions.
  • I have recommended changes in design based on constructability reviews.
25 Select the response that best describes your highest level of experience communicating with trades workers (e.g., electrician) to ensure the completion of an architectural/construction project. Answer to this question is required
  • I do not have experience communicating with trades workers.
  • I have communicated with trades workers to determine or estimate project completion dates.
  • I have communicated with trades workers to determine construction methods being used.
  • I have communicated with trades workers to reject a finished construction work product.
  • I have communicated with trades workers to implement corrective actions and improve the quality of the finished work product.
26 For which purposes have you interacted with construction project stakeholders? Answer to this question is required
  • To clarify project scope, timeframes, or costs
  • To provide guidance on regulatory compliance
  • To discuss construction deficiencies
  • To request changes in construction specifications
  • To negotiate change order cost
  • To resolve disagreements about construction standards
  • None of the above
27 Which construction documents have you interpreted to inspect or monitor the progress of construction work? Answer to this question is required
  • Construction material reports or test results (e.g., concrete)
  • Construction work schedules
  • Project cost estimates
  • Project budgets
  • None of the above
28 Which construction documents have you interpreted to inspect or monitor the progress of construction work? Answer to this question is required
  • Shop drawings
  • Architect notes
  • Equipment specifications
  • Building system schematics
  • Change orders
  • Engineering specifications
  • Architectural renderings
  • None of the above
29 Select the response that most closely reflects your experience with change orders on commercial construction projects. Answer to this question is required
  • I do not have education, training, or experience with construction change orders.
  • I have completed coursework related to construction change orders, but have not applied it to work.
  • I identified when construction change orders were needed to complete a project.
  • I recommended the acceptance or rejection of change orders based on an analysis of project scope, schedule, and cost.
  • I made the final decision on the acceptance or rejection of change orders based on an analysis performed by other employees.
30 With which construction stakeholders have you collaborated to complete a project? Answer to this question is required
  • Trades/Crafts workers (e.g., construction workers)
  • Architects
  • Engineers
  • Organizational executives (e.g., senior leadership)
  • Organizational managers (e.g., mid-level leadership)
  • Local/municipal authorities
  • External consultants
  • None of the above
31 For which purposes have you interacted with construction project stakeholders? Answer to this question is required
  • To validate the construction method
  • To improve architectural design
  • To challenge the project's compliance with codes
  • To enforce safety standards
  • To request missing information
  • To agree on a projected completion date
  • None of the above
32 Which activities have you independently performed in a construction setting? Answer to this question is required
  • Determined loads on architectural and civil engineering structures.
  • Created engineering drawings.
  • Estimated cost of alternative architectural designs.
  • Developed technical construction specifications to guide trade/craft workers.
  • Created cost estimates for construction change orders.
  • Prepared construction activity status reports that included supporting records (e.g., digital photos).
  • None of the above.
33 Which items have you inspected/analyzed for conformity with construction contract requirements? Answer to this question is required
  • Material samples
  • Catalogs and brochures
  • Shop drawings
  • Installation manuals
  • Cost estimates
  • None of the above
34 Have you rejected construction work performed by contractors and requested corrective actions? Answer to this question is required
  • Yes
  • No
35 Which architectural/construction problems have you independently resolved? Answer to this question is required
  • The need to retrofit new construction with existing legacy systems
  • Incompatibility of planned work with space constraints
  • The need to improvise materials/equipment
  • Misinterpretation of architectural design or construction specifications
  • Work stoppages/schedule delays
  • Negative impact of construction on customers
  • Unsafe work practices
  • None of the above
36 Select the response that best describes your highest level of experience resolving construction project problems (e.g., schedule delays, quality of contractor work). Answer to this question is required
  • I do not have experience resolving construction project problems.
  • I have monitored construction projects and reported problems to a senior employee for resolution.
  • I have identified problems with construction projects and discussed potential solutions with a senior employee prior to taking corrective action.
  • I have independently prioritized and resolved problems with construction projects.
37 Which tasks have you performed in the field to monitor the status of construction projects? Answer to this question is required
  • Performed randon inspections
  • Reviewed construction material
  • Evaluated construction status reports
  • Conducted regular/scheduled site visits to monitor project performance
  • None of the above