Nigeria

Vacancy Details

Grade: 11

No questions specified.

Grade: All Grades

1 Are you able to legally work in this country? Answer to this question is required
  • Yes
    1.1 If yes, tell us more about yourself and if applicable, select the type of permit you currently possess (upload the appropriate paperwork in the Documents section)
    • I am a citizen of this country.
    • I have a work permit.
    • I have a study permit.
    • I have a U.S. diplomatic visa.
    • I am the holder of a non-diplomatic visa
    • I am the holder of a work and/or residency permit of the host country.
    • None of the above.
  • No
2 Are you a former employee of this mission/consulate?  Answer to this question is required
  • Yes
  • No
3 Do you have the required education as stated in the Vacancy Announcement? Answer to this question is required
  • Yes
  • No
4 What is the highest level of education you have completed? Answer to this question is required
  • Primary School
  • Secondary School
  • College (2 years)
  • University Degree
  • Masters or Equivalent
  • Doctorate
5 Do you have the required experience as stated in the Vacancy Announcement? Answer to this question is required
  • Yes
  • No
6 Select your years of experience for this position. (See Vacancy Announcement.) Answer to this question is required
  • None
  • Less than 1 year
  • 1 to 2 years
  • 2 to 3 years
  • 3 to 4 years
  • 4 to 5 years
  • 5 to 6 years
  • 6 to 7 years
  • 7 to 8 years
  • 8 to 9 years
  • 9 to 10 years
  • More than 10 years
7 Do you have the required language level (s) for  the listed language (s) in this vacancy announcement? Answer to this question is required
  • Yes
  • No
8 Where did you first see/hear about this position? Answer to this question is required
  • U.S. Mission Website
  • Social Media (i.e. Facebook, Twitter, Instagram, WhatsApp)
  • Professional Networking Site (i.e. LinkedIn, Netparty, Jobcase)
  • Online Job Board (i.e. Indeed, Monster, Glassdoor)
  • Traditional Media (i.e. Newspaper Ad, Magazine, Pamphlet, Radio)
  • University/College Website
  • Job Fair
  • Word of Mouth (Friend, Colleague)
  • Recruitment/HR Team
9 Which project management tasks have you performed? Answer to this question is required
  • Managed a short term project (only a few months) with limited staff (less than 10)
  • Managed a long term project (more than a few months) with many staff (more than 10)
  • Created project plans and schedules
  • I have not managed a project.
10 Which of the following describes your highest level of experience establishing project timelines? Answer to this question is required
  • I have established a project timeline based on a preset protocol.
  • I have established project timelines for multiple, competing projects based on a preset protocol.
  • I have independently established a project timeline by analyzing the project requirements and resource availability.
  • I have independently established project timelines for multiple, competing projects by analyzing project requirements and resource availability.
  • None of the above.
11 Select the project planning tasks that you have performed. Answer to this question is required
  • I have coordinated priorities with the needs of customers and other stakeholders.
  • I have managed project resources based on project goals.
  • I have assigned priorities, schedules, and deadlines to others on my team to address key issues/project deliverables.
  • I have developed project budgets based on the estimated costs.
  • I have monitored project expenditures for accuracy and appropriateness.
  • None of the above.
12 Select the project management activities you have independently performed. Answer to this question is required
  • Developed a project plan (e.g., schedules and/or timelines)
  • Assigned resources to tasks
  • Tracked progress of tasks and deliverables
  • Managed costs/budget
  • Analyzed staff workloads
  • None of the above
13 Which phases of an international Water, Sanitation, and Hygiene (WASH) program have you led for developing countries? Answer to this question is required
  • Design
  • Implementation
  • Program management/oversight
  • Evaluation
  • None of the above
14 Have you conducted environmental analysis of sustainable Water, Sanitation, and Hygiene (WASH) systems? Answer to this question is required
  • Yes
  • No
15 Which phases of an international environmental development assistance program have you led? Answer to this question is required
  • Design
  • Implementation
  • Program management/oversight
  • Evaluation
  • None of the above
16 Which statement best describes your highest level of experience in water quality management? Answer to this question is required
  • I managed a water quality and pollution control program.
  • I independently conducted water quality investigations and problem assessments.
  • I developed water quality standards and/or water quality monitoring plans that were reviewed by a senior employee.
  • I completed education or training related to water quality management but have not yet applied it on the job.
  • None of the above.
17 Which statement best describes your highest level of experience with Water, Sanitation, and Hygiene (WASH) programs? Answer to this question is required
  • I have education and/or training related to WASH programs, but have not yet applied it on the job.
  • I have assisted in the implementation of WASH programs by following senior guidance and existing policies.
  • I have led the implementation of WASH programs in a developing country by monitoring progress and providing technical oversight.
  • I have developed policy/procedural guidance related to implementing WASH programs in developing countries used by others.
  • None of the above
18 Which types of sustainable water management programs have you implemented in developing countries? Answer to this question is required
  • Access to clean drinking water
  • Ecosystem supporting services
  • Recreational/cultural water use management
  • Water use in economic productivity projects (e.g., agriculture, hydroelectricity, industrial processes)
  • River basin management
  • Creation of marine or freshwater fisheries
  • None of the above
19 In which areas have you designed and/or implemented programs in developing countries? Answer to this question is required
  • Sustainable urban or regional planning
  • Clean energy
  • Renewable energy
  • Energy efficiency
  • Marine Conservation
  • None of the above
20 Which programs have you independently implemented in urban areas? Answer to this question is required
  • Clean production electricity
  • Sanitation
  • Garbage/solid waste
  • Clean Energy
  • Air pollution reduction
  • Environmentally sound shelter/housing
  • None of the above
21 Which statement best describes your highest level of experience managing storm-water systems? Answer to this question is required
  • I have education and/or training in storm-water management techniques but have not yet applied it on the job.
  • I implemented storm-water management initiatives developed by senior engineers.
  • I revised existing storm-water management designs to reduce runoff and improve water quality.
  • I designed storm-water management systems for optimal efficiency and quality.
  • None of the above.
22 Have you partnered with an international donor organization to achieve mutual goals? Answer to this question is required
  • Yes
  • No
23 With whom have you negotiated on economic-related issues for a developing country ? Answer to this question is required
  • Donor representatives
  • Senior government officials
  • University representatives
  • Nonprofit organizations (NPO)
  • Private businesses (e.g., industry lead companies)
  • None of the above
24 With which audiences you have you communicated as a part of work? Answer to this question is required
  • Government agencies
  • Academia
  • Private industry organizations
  • Civic organizations
  • General public
  • None of the above
25 Which statement best describes your highest level of experience maintaining pool water quality? Answer to this question is required
  • I completed training or education on maintaining pool water quality, but have not yet applied it on the job.
  • I tested water parameters and suggested chemical adjustments to a senior technician.
  • I independently determined the chemicals needed to adjust water parameters in accordance with United States (US) guidelines.
  • I provided guidance to junior technicians on how to maintain pool water quality.
  • None of the above.
26 Select the types of individuals you have worked with on a team to accomplish goals and assignments. Answer to this question is required
  • Individuals with a different level of skill than my own
  • Individuals from a different technical discipline than my own
  • Individuals with a different level of education than my own
  • Individuals from a different culture than my own
  • Individuals whose native language is different from my own
  • Individuals from a different socio-economic status than my own
  • Individuals from a different generation than my own
  • None of the above
27 For what purposes have you collaborated with external groups? Answer to this question is required
  • To identify new ways to help existing partners
  • To better understand the individual’s/group’s goals, perspectives, and activities
  • To strengthen relationships that have weakened
  • To forge new partnerships
  • To identify ways to improve work effectiveness/efficiency
  • None of the above
28 Identify the types of teams that you have worked on. Answer to this question is required
  • Multi-disciplinary
  • Cross-functional
  • Multi-organizational/agency
  • Specialty area focus group
  • Civic committees
  • None of the above
29 Have you worked on a cross-functional project team to accomplish common goals (i.e., team comprised of individuals with unique, specialized skills or representing different offices)? Answer to this question is required
  • Yes
  • No
30 Which statement best describes your highest level of experience working on a team? Answer to this question is required
  • I worked on a team as part of a class assignment.
  • I worked on a team in a professional setting.
  • I led tasks of a larger project on a professional team.
  • I led a team of employees and was responsible for the overall project completion.
  • None of the above.
31 Which program-planning tasks have you performed? Answer to this question is required
  • Developed a program plan to accomplish established goals.
  • Developed short-term goals (i.e., fiscal year) for an organization or program.
  • Developed long-term goals (i.e., 4/5 years) for an organization or program.
  • Established organization or program productivity standards.
  • Assigned tasks and responsibilities to team units.
  • None of the above.
32 With which entities have you developed successful working relationships? Answer to this question is required
  • Executive management officials within my organization
  • Law enforcement agencies
  • Local government agencies
  • Members of the general public
  • None of the above
33 Select the maintenance activities you have performed to operate/maintain water systems. Answer to this question is required
  • Adjusted control valves
  • Lubricated parts (e.g., pumps, motors)
  • Replaced belts (e.g., fan belts)
  • Made temporary modifications/repairs to piping
  • Changed filters (e.g., oil filters, water filters)
  • None of the above
34 Which project management activities have you performed? Answer to this question is required
  • Defined project requirements
  • Developed a project plan (e.g., schedules, timelines, milestones)
  • Assigned tasks/assignments to team members
  • Tracked progress of tasks and deliverables
  • Developed contingency plans to stay on schedule/avoid risks
  • Held status update meetings to discuss progress
  • Managed costs/budget
  • Analyzed employee work to assign additional tasks
  • Monitored and/or provided feedback on team performance
  • None of the above
35 Which activities have you independently performed to support an international professional development exchange program (i.e., students, thought/opinion leaders, language programs)? Answer to this question is required
  • Recruited participants for exchange programs.
  • Coordinated processes to review/select participants for the exchange programs.
  • Monitored development of the participants engaged in an exchange program.
  • Organized pre-departure/arrival logistics, orientations, and briefings for participants.
  • Facilitated visa issuance.
  • Arranged debriefings of the participants to determine the need for improvement.
  • None of the above.
36 Have you served as a panel member that reviewed humanitarian assistance project proposals on the behalf of the donor organization? Answer to this question is required
  • Yes
  • No
37 Select the humanitarian assistance sectors in which you have managed projects/programs (i.e., monitored performance and administered budget)? Answer to this question is required
  • Protecting rights and duties set out in international law
  • Education assistance
  • Emergency shelter
  • Water and sanitation
  • Repatriation and reintegration programs
  • None of the above
38 With which types of organizations have you partnered while leading humanitarian assistance projects? Answer to this question is required
  • The Office of the United Nations High Commissioner for Refugees (UNHCR)
  • International Organization for Migration (IOM)
  • International humanitarian agencies (e.g., Action Against Hunger)
  • International donor agencies
  • Host country organizations in the private sector
  • None of the above